Basement water damage, finished basement in Glen Ellyn, IL
· EcoClean team: Diego
The basement in this Glen Ellyn home was finished with a panelized wall system rather than drywall, and that detail drove the whole job. After the basement flooded, the plan was to take the panels out entirely. Each one was about three and a half inches thick and built in three layers, and before demolition started we waited on the wall system's maker to confirm the proper way to take it apart. Diego, the project manager, classified the water as Category 3.
On the first day the crew laid floor protection at the entry, moved the contents and covered them with painter's plastic. They pulled the baseboard and trim, removed the cover plates, and took down every door, keeping the hardware on site. Then the wall panels came out. The window sills and the sump closet had been framed through those panels, so both had to be removed to get the walls free. Debris was cleaned up and bagged as they went. Two dehumidifiers started that day; the air movers waited until the demolition was finished, and the antimicrobial waited with them.
At the owner's request the crew came back three days later for the rest: one wall in the furnace room, the closet beside it, the stairway walls and a second closet. In each spot they removed the remaining panels and every screw left in the framing, cleaned the area and applied antimicrobial. Three air movers went into each of the furnace area and the two closets, nine in all.
Three days after that second visit the monitoring check found everything dry. The crew removed every piece of equipment, and the owner signed off on completion. The owner asked to be kept informed as the rebuild got under way.
Pool table wrapped in protective plastic while the surrounding basement dries out in a Glen Ellyn home.